Client: Specialist tunnelling contractor
Location: New South Wales
Services: Pre-Contract Reviews
The Problem
A specialist tunnelling contractor was presented with onerous subcontract terms for shaft and boring works by a head contractor and a joint venture. Separately, it needed protection when dry-hiring one of its tunnel boring machines to another contractor.
Our Role
PCAG reviewed the proposed terms from a contractor-side perspective, identified the commercially significant risks and supported the client through negotiation.
Deliverables
- Proposed departures schedules for each subcontract, with supporting rationale
- A refined, prioritised set of departures after the joint venture pushed back
- A revised machine hire agreement with commercial, legal and insurance protections
Outcome
The proposed subcontract departures were agreed almost in full.